The real cost of cloud egress, worked through
Egress pricing is not a fee for bandwidth. It is a fee for leaving, and the arithmetic is worth doing before you commit.
Egress pricing is the most consequential line item in cloud architecture and the one most often discovered late. Compute is comparable across providers, storage is close, and then the bill arrives with a data-transfer-out charge that is larger than both.
The three prices for the same gigabyte
Moving a gigabyte from a server to a user is one physical operation with three very different prices depending on who is selling it.
Public internet egress from a hyperscaler
Typically in the range of $0.05 to $0.12 per gigabyte in major regions, with volume tiers that improve slowly and rarely dramatically. There is no meaningful competitive pressure here because the cost is only visible after you have built on the platform.
Direct-connect egress
Roughly $0.02 per gigabyte, plus a flat port charge for the interconnect. The same packets, the same destination, a fraction of the price - because now you have an alternative and the pricing reflects it.
Wholesale IP transit
Priced per megabit per second of committed capacity, not per gigabyte. At commodity rates a 95th-percentile commit works out well under a cent per gigabyte at any serious volume.
Worked example: 500 TB per month
Assume a steady 500 TB of monthly egress, reasonably smooth, peaking around 1.9 Gbps at the 95th percentile.
| Path | Unit price | Monthly cost |
|---|---|---|
| Hyperscaler public egress | $0.085 / GB | ~$42,500 |
| Hyperscaler via direct connect | $0.02 / GB + $300 port | ~$10,300 |
| Wholesale transit at 2 Gbps commit | $0.30 / Mbps | ~$600 |
The gap between the first and third row is roughly seventy to one. That is not a negotiating position; it is a different business model. The hyperscaler is not selling you bandwidth, it is selling you the option to leave, and pricing it accordingly.
Where the break-even sits
A direct-connect port pays for itself against public egress at somewhere around 5 TB per month - low enough that most production workloads clear it easily.
Moving egress-heavy serving off the hyperscaler entirely is a bigger decision, but the break-even is also low: at commodity transit rates, a few tens of terabytes a month justifies the operational overhead of running your own edge, and by a few hundred terabytes it is not a close call.
The patterns that reduce the bill
Put the origin where egress is cheap
If the CDN pulls from an origin inside a hyperscaler, every cache fill is billed egress. Move the origin to a network where egress is not metered and the fill traffic stops appearing on the bill at all.
Watch cross-AZ traffic
Inter-availability-zone transfer is billed in both directions in most clouds. A chatty microservice mesh spread across three AZs for resilience can generate more internal transfer cost than external egress. Measure it before you assume egress is the problem.
Storage egress is the quiet one
Object storage read charges look small per gigabyte until a full restore or a large analytics job runs. If your backup target charges for reads, you are being charged precisely when you can least afford the delay - during a recovery. Storage where reads are free changes what is architecturally reasonable.
Compression and cache hit ratio are cost controls
Every percentage point of cache hit ratio is a percentage point off the origin egress bill. Brotli or Zstd on text assets is a straightforward twenty to thirty percent reduction on the compressible share of traffic.
The honest caveats
Running your own edge is not free. Someone has to operate it, capacity has to be planned, and the failure modes become yours. For a team without network operations capability, direct-connect egress is the pragmatic answer: most of the saving, none of the new responsibility.
And the transit figure above assumes reasonably smooth traffic. A workload that is idle for twenty-nine days and then bursts to 40 Gbps for one is billed on the burst under 95th percentile, and per-gigabyte pricing may genuinely be cheaper. Know your own shape before you conclude anything.
The question worth asking
Not "what does egress cost" but "what does egress cost me, at my volume, on my traffic shape, on each of the three paths". The answer is usually a spreadsheet away, and it is usually surprising.